Project

General

Profile

Actions

Task #4091

closed

Adapt to ndn-cxx v2::KeyChain and Validator

Added by Zhiyi Zhang over 7 years ago. Updated about 6 years ago.

Status:
Closed
Priority:
Urgent
Assignee:
-
Target version:
-
Start date:
05/24/2017
Due date:
% Done:

100%

Estimated time:
3.00 h

Description

Adapt repo-ng codebase to use ndn-cxx v2::KeyChain and v2::Validator.

Actions #1

Updated by Junxiao Shi over 7 years ago

  • Subject changed from Urgent bugs caused by ndn-cxx change 3547 to Adapt to ndn-cxx v2::KeyChain and Validator
  • Description updated (diff)
  • Status changed from New to In Progress
  • Assignee set to Junxiao Shi
  • Estimated time changed from 1.00 h to 3.00 h
Actions #2

Updated by Junxiao Shi over 7 years ago

  • % Done changed from 0 to 40

https://gerrit.named-data.net/3928 adapts the codebase to v2::KeyChain, and disables old validator.

Integrated tests WatchDelete test case is failing but I do not have any clue how it works. It will not block Jenkins build, however.

Actions #3

Updated by Junxiao Shi over 7 years ago

  • Description updated (diff)
Actions #4

Updated by Junxiao Shi over 7 years ago

  • Assignee deleted (Junxiao Shi)

ndn-cxx Change 3646 eliminates v1 ValidatorNull which I started in note-2 using as a temporary solution before the replacement of ValidatorConfig is available. Unfortunately, there is no easy workaround. The proper solution to this is #4129, but I do not have the energy to work on that.
I'll no longer work on this issue. If your deployment depends on a repository, consider switching to repo-sql which I will continue to maintain.

Actions #5

Updated by Junxiao Shi over 7 years ago

  • Assignee set to Muktadir Chowdhury
Actions #6

Updated by Junxiao Shi over 7 years ago

  • Blocked by Feature #4129: Management Dispatcher for repo commands added
Actions #7

Updated by Alex Afanasyev over 7 years ago

https://gerrit.named-data.net/#/c/4122/

Need thorough testing, but all the code seems to be there.

Actions #8

Updated by Alex Afanasyev over 7 years ago

  • Assignee deleted (Muktadir Chowdhury)
Actions #9

Updated by Davide Pesavento over 6 years ago

  • Status changed from In Progress to Resolved
  • % Done changed from 40 to 100

I suppose we can close this.

Actions #10

Updated by Junxiao Shi about 6 years ago

  • Blocked by deleted (Feature #4129: Management Dispatcher for repo commands)
Actions #11

Updated by Junxiao Shi about 6 years ago

  • Status changed from Resolved to Closed
Actions

Also available in: Atom PDF